Comment on How did we get humans on the moon in 1969 and are still struggling to get the Starship rocket to launch properly?

<- View Parent
Bimfred@lemmy.world ⁨5⁩ ⁨months⁩ ago

SpaceX didn’t need a mockup to present. They had prototypes of the base vehicle and a proposal for necessary modifications to perform the contract duties and an established track record of developing ambitious rocket engines and launch vehicles. BO had bits and pieces of other things they were gonna bolt together and a pretty model of how it’ll look like, we swear, scout’s honor. But if you’re talking about the Blue Moon that eventually won the secondary bid, that’s not what they initially proposed.Blue Moon Mk2 is a variant of a lander that’s been in development since 2016, so two years longer than SpaceX’s Starship prototypes. The one that’s planned for a lunar landing this year, Blue Moon Mk1, isn’t the one they bid for HLS. It’s a robotic lander, smaller than the HLS’s Mk2. And remember, BO is developing a lander. SpaceX is developing a fully reusable super heavy lift rocket, an interplanetary transport craft and a lunar lander as part of the same package.

AFTER being told to do so. That’s the entire problem. Blue Origin and Dynetics both came forward and said they’d gladly match that bid, but since they didn’t get the special information that was only given to SpaceX, they couldn’t know this.

Finish reading my post. SpaceX’s initial bid was 2.94 billion and the final award was 2.89 billion. Again, they agreed that they can do the job for 50 million less than what they originally bid. BO’s and Dynetics’ proposals would’ve suffered a much larger hit. And sure, BO got the secondary contract for 3.4 billion, after rethinking their entire proposal. So why did they not submit that one in the first place? If they had, they might have gotten a similar call.

source
Sort:hotnewtop