Comment on The train that never came; how maglev technology was derailed

<- View Parent
InevitableList@beehaw.org ⁨4⁩ ⁨days⁩ ago

I read an article about China’s HSR that stated that a line with a top speed of 350km/h was 90% more expensive to build than a line built for 250km/h. The trains don’t spend much time at top speed during short journeys either. economist.com/…/china-has-built-the-worlds-larges…

A cubic meter of air weighs 1kg according to a Big, Bigger, Biggest episode about France’s TGV. Japan’s new Maglev is significantly smaller than the Shinkansen and the tunnels it runs through are 20% bigger since standard HSR already has problems with tunnel boom that can be mitigated at the tunnel entrance and exit. I also wonder how trains traveling in opposite directions will handle passing each other at 1000km/h given China is already working on next gen trains with that speed as a goal.

source
Sort:hotnewtop